A roof replacement is loud and dusty, and it goes fast. A little prep makes the job easier on everyone. Below is a typical job in order, what you'll hear and see, and what to do before the crew shows up and after they leave. Every roof and every crew is different, so treat the timeline as a rough guide.
How long does a roof replacement take?
IKO, a shingle maker, says a new roof is typically a two-day process, with some jobs done in a day and others taking three. Size, steepness, the number of old layers, decking repairs and weather all change the schedule. Ask your contractor for a start date and expected finish in writing.
How do I prepare in the week before?
GAF's homeowner checklist is a good model. Here is a condensed version.
- Permits. Ask whether your city needs a permit and who will pull it. See roof permits by city.
- HOA. Check work hours and any approval your HOA needs. See our HOA roof approval guide.
- Dishes and solar. Schedule removal and reinstall of satellite dishes or solar panels.
- Delivery spot. Agree where the dumpster and shingles go.
- Photos. Take pictures of your driveway, landscaping and exterior, in case anything is damaged.
- Yard. Mow the lawn so dropped nails are easier to find. Mark sprinkler heads. Move patio furniture, grills, toys and potted plants away from the house. Take down flags and wind chimes.
- Power. Point out outdoor outlets the crew can use.
What should I do inside the house?
Hammering shakes the whole structure. GAF and IKO both suggest:
- Take down mirrors, artwork, shelves and TVs mounted on walls.
- Move or cover valuable items stored in the attic. Lay a drop cloth on the attic floor, because dust and debris will shake loose.
- Cover things in the garage. Garages often get the most dust because they are rarely insulated.
- Plan for noise if you work from home, and plan where pets and kids will be.
What should I do the night before?
- Move cars out of the driveway and garage. The crew needs the space, and falling debris can damage paint and glass.
- Keep pets inside, or move them to a pre-arranged spot.
- Unlock gates and clear paths around the house.
- Leave your phone number with the contractor.
What happens on replacement day, step by step?
Roofers start early. The order below is typical for an asphalt shingle roof. On a two-day job, the steps simply spread across both days.
| Stage | What the crew does | What you notice |
|---|---|---|
| Arrival | Walk-around, set up dumpster, tarps over plants, driveway and patio | Trucks, ladders, quick talk with the lead |
| Tear-off | Remove shingles and underlayment down to the deck | The loudest part; debris falling |
| Deck check | Look for soft or rotten wood and replace bad sheets | Possible call about extra decking |
| Dry-in | Install drip edge and underlayment | Roof turns a solid color |
| Shingles | Starter course, then shingles from the eaves up | Steady nail guns |
| Details | Flashing at walls and chimneys, pipe boots, vents | Quieter, slower work |
| Ridge | Ridge vent and ridge cap at the peaks and hips | Near the end |
| Cleanup | Debris into the dumpster, magnetic nail sweep | Crew working the yard |
| Walk-through | Review the work with you | Your chance to ask questions |
A few notes on the key steps:
- Tear-off. Building codes generally call for removing old roofing down to the deck before re-roofing. Arlington's bulletin cites that rule (code section R908.3) and lists the few exceptions.
- Decking. GAF notes the deck is inspected once the old materials are removed, and bad sheets are replaced, often at a per-sheet price. Your contract should already list that price. Our estimate guide explains why.
- Dry-in. Owens Corning's instructions place underlayment over the drip edge at the eave and under it at the rakes, or as local code requires.
- Cleanup. GAF says cleanup should include sweeping for roofing nails. If you find a stray nail or two later, more may be hiding, and you can ask the crew to come back for another magnetic sweep.
Stay off the roof yourself. NRCA tells homeowners to inspect only from the ground and leave roof work to professionals.
How loud is it?
Very. GAF warns that walls vibrate and loud noises occur while roofers work. Tear-off is the worst of it. You may want to plan errands, a visit with relatives or pet daycare for the first day. If you leave, stay reachable in case the crew finds a decking problem.
What if it rains or turns cold?
Rain is the main risk while the roof is open. Owens Corning tells installers to prevent the wood deck from getting wet before, during and after installation. Before work starts, ask your contractor:
- How much of the roof do you tear off at a time?
- How do you cover open areas if a storm pops up?
- Will the roof be fully dried in at the end of each day on a multi-day job?
- Who do I call after hours if water gets in?
Cold matters too. Owens Corning says that below 40 degrees F, shingles need extra care in handling, and shingles around the roof's edges must be hand-sealed with asphalt cement dabs, because the factory adhesive strip may not activate in the cold.
What about permits and inspections?
Rules depend on your city.
- Fort Worth. The city's re-roofing FAQ says no permit is needed to replace only shingles on a one- or two-family home, but a permit is needed if any decking is replaced. Since bad decking is found during tear-off, ask your contractor ahead of time how they handle a permit if it comes up. The city still enforces its codes, including drip edge and crickets.
- Arlington. The bulletin says a permit is required unless the replaced area is 10 percent or less of the roof, and the permit must be issued and posted before work starts. At the final inspection, the inspector checks that plumbing and exhaust vents were not covered and that flashing and metal edges were replaced if needed.
What should I do after the crew leaves?
- Walk the yard and driveway. Look for nails, debris and any damage.
- Look at the roof from the ground. Use binoculars, or ask for drone photos.
- Do the final walk-through. Point out anything that looks off and ask what was done.
- Get the paperwork. GAF suggests keeping the permit (if any), your contract, the workmanship warranty and the manufacturer warranty. Read the warranty right away so you don't void it by accident. Our roof warranty guide explains registration.
- Reinstall dishes or solar. Call those providers.
- Hold the reserve. Texas law has owners reserve 10 percent of the contract price until 30 days after the work is complete. See your rights when you hire a contractor in Texas.
Common questions
How long does a roof replacement take?
It depends on the size and shape of the roof, the number of layers, decking repairs and weather. IKO says a new roof is typically a two-day job, with some done in one day and others taking three. Ask your contractor for the expected start and finish dates in writing.
Can I stay home during a roof replacement?
Usually yes, but it is loud. GAF warns that walls vibrate and loud noises happen all day. If you work from home or have noise-sensitive pets or small children, consider being somewhere else for the tear-off.
What happens if it rains during my roof replacement?
Shingle makers want the deck kept dry. Owens Corning's instructions tell installers to prevent the wood deck from getting wet before, during and after installation. Ask your contractor how much roof they open at once and what they do if weather moves in.
Do I need to be home on roof replacement day?
Not the whole day, but be reachable. GAF suggests walking the house with the crew before work starts and staying in easy contact if you leave. Plan to be there for the final walk-through.
Do I need a permit to replace my roof in Fort Worth?
Fort Worth's re-roofing FAQ says no permit is needed to replace only shingles on a one- or two-family home, but a permit is needed if any decking is replaced. Arlington requires a permit unless the area replaced is 10 percent or less of the roof. Other cities differ.
Sources
- GAF RoofViews: The ultimate homeowners checklist for your next roofing project (Annie Crawford, 24 Sep 2021) (accessed Oct 8, 2026)
- GAF RoofViews: What's included in a roof replacement? (Dawn Killough, 24 Jul 2026) (accessed Oct 8, 2026)
- IKO: How to prepare for a roof replacement (4 Jun 2025) (accessed Oct 8, 2026)
- Owens Corning: Duration Series shingles installation instructions (July 2026, PDF) (accessed Oct 8, 2026)
- NRCA: Homeowners affected by severe weather should use caution when repairing roofs (7 Sep 2021) (accessed Oct 8, 2026)
- City of Fort Worth: Residential re-roofing FAQ (PDF) (accessed Oct 8, 2026)
- City of Arlington: Re-roof permits, inspections and common Q&A (technical bulletin, 13 Sep 2023, PDF) (accessed Oct 8, 2026)
- Texas Property Code Sec. 53.101, Required retainage (accessed Oct 8, 2026)